Unboxing and system preparation
Identify the supplied components, prepare the system, and position it correctly before making water connections.
Explore our top picks:
INSTALLATION AND SETUP
Choose your Electrolux water system, then follow both tutorials in order before first use.
PUREESSENCE ECO · 600 GPD
Begin with the system preparation tutorial, then complete the tubing and filter connections.
Identify the supplied components, prepare the system, and position it correctly before making water connections.
Connect the color-coded tubes, install the filters, and check each fitting before the initial flush.
PUREONE HOT · 800 GPD
Set up the system first, then install the faucet and complete the water-supply connections.
Prepare the unit, identify the connection points, and place the system correctly inside the cabinet.
Install the faucet, connect the water lines and power, then flush and test the system before regular use.
PURE ESSENCE · 1000 GPD
Use the first tutorial for system setup, then follow the dedicated water-pipe installation guide.
Prepare the Pure Essence system and review the installation sequence before connecting the water lines.
Connect the raw-water, pure-water and drain lines to the labeled ports, then inspect every fitting.
PUREONE · 1200 GPD
Install the faucet and prepare the system first, then complete all connections, flushing and setup.
Identify the supplied parts, prepare the installation area, and install the dedicated drinking-water faucet.
Connect the tubing and power, complete the initial flush, and confirm normal operation before regular use.
WHOLE-HOUSE WATER SOFTENER
Follow the complete installation walkthrough for the Electrolux whole-house water softener before first use.
Review the installation sequence, connections and first-use preparation in one complete walkthrough.
BEFORE YOU START
Relieve water pressure before disconnecting or adding any fittings.
Check cabinet clearance, faucet position, drain access, and the electrical outlet.
Match each tube to the labeled port and fully seat all quick-connect fittings.
Complete the initial flush and check the system carefully for leaks.